This week one doorway to the loading dock has been raised to 10 feet high, the same height as the doors to the Imaging Lab to accommodate the movement of large objects. Insulation was installed on the newly erected ductwork. Installation of copper heating pipes and ductwork continues.
This area of the hallway has been raised to 10 feet to accommodate large objects that will be transferred from the loading dock to the Imaging Lab for digitization.
Insulation has been added over the ductwork to keep air heated in the winter time and to reduce condensation from cool air in the summer time.
A pipefitter solders copper heating pipe together over the office area of the Imaging Lab.
Ductwork connection being placed in the wall between Studio 3 and the office area.